Design and Construct

  • Type: Residential
  • No: Construction of a Dual Occupancy
  • Build Time: 45 Weeks

Scope:

  • Design of town planning for a Dual Occupancy by MJS
  • Building permit drawings by MJS
  • Construction – Each one has 4 bedrooms with a master to the GF
  • External facade – Brick and light weight render to the ground floor. Light weight render and cladding to the first floor
  • Project included: landscaping and driveways, full height tiling to selected walls of wet areas, timber floors, timber stairs, Laminate kitchens, stone benchtops, Smeg appliances
Scroll to Top