41 Albion Rd Glen Iris

Design & Construct

  • Type: Residential
  • No: Completion of a Dual Occupancy
  • Build Time: 44 weeks

Scope:

  • Design of town planning for a Dual Occupancy by client
  • Building permit drawings by MJS
  • Construction – Each one has 4 bedrooms with a master to the GF
  • External facade – Brick and render and to the ground floor. Light weight render to the first floor
  • Project included: landscaping, swimming pool, driveways, full height tiling to selected walls, timber floors, timber stairs, laminate kitchens, stone benchtops, double glazed windows, Smeg Appliances
Scroll to Top