Design & Construct

  • Type: Residential
  • No: Construction of a Dual Occupancy
  • Build Time: 48 weeks

Scope:

  • Design of town planning for a Dual Occupancy by MJS
  • Building permit drawings by MJS
  • Construction – Each one has 4 bedrooms with a master to the GF and FF
  • External facade – Brick and render and to the ground floor. Light weight cladding to the first floor
  • Project included: car turntables, driveways, full height tiling to wet areas, timber floors, 2pac kitchens, custom joinery throughout, stone benchtops, double glazed windows, NEFF Appliances
Scroll to Top